Permit applications and approvals — building department
5w
Subcontractor bidding and selection — trades
4w
Material procurement — long-lead items
4w
Site prep and temporary utilities — layout and access
4w
Foundation excavation and footings
2w
Framing — walls, floors, and roof structure
2
Rough-in — electrical, plumbing, and mechanical
Insulation and drywall — interior finish start
Trim, paint, and flooring — interior finishes
Final walkthrough and punch list — pre-close inspection
Final cleanup and debris removal — construction site
Safety meeting and site orientation — all trades
4w
Construction site safety signage and barrier setup
4w
Concrete slab pour — foundation phase scheduling
3w
Construction site signage and safety barrier installation
4w
Windows and doors installation — schedule and order
12
Concrete slab pour — foundation inspection scheduling
3w
Construction schedule — critical path and milestone dates
4w
Construction waste management and dumpster schedule
5w
HVAC rough-in — ductwork and vent placement
7
Construction site security — fencing, lighting, and camera plan
4w
Construction Project Management Checklist›

Material procurement — long-lead items